Charlottenburg Combined Heat and Power Plant (CCHP) - Lot 1
BEW Berliner Energie und Wärme GmbH, Berlinvergeben
- Frist (abgelaufen)
- vor 982 Tagen abgelaufen
- Geschätzter Wert
- nicht angegeben
- Verfahren
- Verhandlungsverfahren mit Teilnahmewettbewerb, Bauleistung
- Ort der Leistung
- Berlin · Berlin
- Veröffentlicht
- Laufzeit
- 15.08.2025 bis 30.09.2030
- CPV
- 45251100 Bauarbeiten für Kraftwerke09323000 Fernwärme · 24111600 Wasserstoff · 31120000 Generatoren · 31170000 Transformatoren · 42112300 Gasturbinen · 42123100 Gaskompressoren
Beschreibung
This lot 1 includes the turnkey engineering, procurement, construction and commissioning of - 3 gas turbine generator trains & heat recovery boilers, incl. auxilliary systems. Utilization of supplementary firing as necessary - gas compressor station - 110kV grid connection and power supply system - buildings for each of the above mentioned systems (being three main buildings. For the main turbine hall building a "0-meter" level with a sufficiently designed foundation will be provided by the awarding authority). -Long Term Service Agreement (LTSA) for the Gas Turbine Units The purpose of the overall undertaking at Charlottenburg Site (located Am Spreebord 5, 10589 Berlin), is to ensure heat supply security in the connected district heating grid by replacement of existing gas fired turbines with reliable alternatives and enable coal phase-out until 2030 by installing additional heat capacity. Furthermore, the undertaking supports regulatory and strategic needs by focusing on low carbon heat generation. By flexible adaption of heat generation to changes of electricity and gas prices, in accordance with overall system demands, the undertaking supports profitable heating business considering future market uncertainty and volatility. To fulfill Vattenfall's fossil free strategy, the undertaking utilizes gas as a transition technology to hydrogen and enables sector coupling. The total required thermal feed-in capacity is approx. 550 MW, split up into a gas fired portion and a power-to-heat portion. Certain relevant limitations for execution of the undertaking, arising from the need for existing assets to remain in operation until new assets are commissioned to ensure supply security, the urban environment, monument preservation requirements for specific buildings, and the available capacity of the gas supply line (approx. 620 MW LHV) - have to be considered. In the course of this undertaking, several projects are being developed by the awarding authority, including building of new generation and infrastructure assets as well as demolition and refurbishments of existing assets; one of such projects is the Charlottenburg Combined Heat and Power project (“CCHP”). This notice concerns and announces the tender for the lot 1 named CCHP project within the undertaking of Charlottenburg Site, which is composed mainly of a gas turbine-based CHP Plant. Other lots and projects will be announced by the awarding authority at a later point in time. However predecessing activities were partly already contracted such as the demolition of the existing buildings as well as preliminary design activities.
Zuschlag
Den Zuschlag erhielt Sener Ingeniería y sistemas aus Getxo am 12.08.2025. 2 Angebote gingen ein.
- Los 1Sener Ingeniería y sistemas, Getxo12.08.2025
Ähnliche offene Verfahren
Tiefbau in Berlin, nach Frist sortiert. Alle anzeigen
- in 7 TagenU2, U-Bhf. Hausvogteiplatz/barrierefreier AusbauBerliner Verkehrsbetriebe, Bereich Einkauf/ Materialwirtschaft · Verhandlungsverfahren mit Teilnahmewettbewerb · BerlinBerlinnicht angegeben
- in 8 TagenGas-, Wasser- und Entwässerungsanlagen innerhalb von Gebäuden, Strangsanierung SanitärLand Berlin – Sondervermögen Immobilien des Landes Berlin (SILB) c/o BIM Berliner Immobilienmanagement GmbH · Offenes Verfahren · BerlinBerlinnicht angegeben
- in 9 TagenBR - Kleinwindkraftanlagen DIN 18382 VE 4-06.3 - Vergabe 20/2026Bundesamt für Bauwesen und Raumordnung, in Vertretung der Bundesanstalt für Immobilienaufgaben · Offenes Verfahren · BerlinBerlinnicht angegeben
- in 10 Tagen"Dreispitzpassage", Claire-Waldoff-Str. 1/3/5, Reinhardstraße 2, Friedrichstraße 130 A/B/C in 10117 Berlin Leistung: Rohbauarbeiten - VOEK 380-26Bundesanstalt für Immobilienaufgaben · Offenes Verfahren · BerlinBerlinnicht angegeben
- in 10 TagenErsatzneubau TechowbrückeWasserstraßen-Neubauamt Berlin · Offenes Verfahrenohne Ortnicht angegeben
- in 17 TagenESTW A Neukölln InnenanlageDB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16) · Offenes Verfahren · BerlinBerlinnicht angegeben