HEBT Modular Stands Batch 4.2
FAIR - Facility for Antiproton and Ion Research in Europe GmbH, Darmstadtvergeben
- Frist (abgelaufen)
- keine Frist angegeben
- Geschätzter Wert
- nicht angegeben
- Verfahren
- Offenes Verfahren
- Ort der Leistung
- Darmstadt · Hessen
- Veröffentlicht
- Laufzeit
- 15.12.2023 bis 15.06.2024
- CPV
- 44200000 Bauerzeugnisse
Beschreibung
The High Energy Beam Tracing (HEBT) system of the FAIR facility enables the transfer of ion, proton and antiproton beams to and from the synchrotron and storage rings, to and from Super-FRS, to the antiproton production target and separator, and to the experimental areas (CBM and APPA). It consists of 29 beamlines with a total length of about 1.5 km. A large number of racks for accelerator components in the beamline area of the HEBT system are required. These racks carry components for beam correction and diagnostics, as well as vacuum components and their connections. In addition, the racks carry the necessary media supply for the components.
Zuschlag
Den Zuschlag erhielt Nortemecanica aus Carreño (Asturias) am 20.11.2023. 11 Angebote gingen ein.
- Los 1Nortemecanica, Carreño (Asturias)20.11.2023ohne Wert